Friday, March 19, 2010

Home Reno - demolition

We got to Home Depot at around 7:15am or so. We wanted to get there early so we had a chance to rent their $20 van to deliver our own plywood, rather than pay the ~$60 for them to deliver it.

IMG_2517 We picked up fifteen 8’x4’x½” sheets of plywood, two bags of mortar, a box of 3700 flooring screws. Thanks to the cashier at Home Depot, we saved $2 on the screws and got 2700 more! We had originally picked up two boxes of 500. They had larger boxes at the cashier, and she pointed out that the 3700 box was $2 cheaper. Go figure. Good thing we went with the larger box because I went screw crazy on the plywood.

By around 3:50pm, we had moved all of the kitchen appliances into the dining area, we had all of the old laminate ripped up, all of the baseboard and ¼ round off, the toilet removed (that old wax(?) ring was f’n gross) and two sheets of plywood installed. It was slow going, mostly because we were trying to cut the plywood to fit all the angles, as opposed to using lots of smaller pieces.

We also slowed down when we were removing the laminate in the bathroom. We had originally planned on gutting the entire bathroom before starting to put down the plywood, but it turned out that the braided hose we got to replace most of the copper pipe was too short. My wife went back to Home Depot and exchanged it for longer hoses and different pressure fittings. But at the same time, we decided on NOT removing the old vanity for the time being because it’s going to be time consuming and we need to try and get our kitchen back to being functional as soon as possible. I figured we could get the kitchen and front entrance tiled and grouted first, and then do the bathroom later.

IMG_2514 We stopped at 7:20pm after installing plywood in the kitchen and the front hall. That’s not as much as I had originally hoped on getting done, but I’m still happy with it. The weather forecast was originally calling for rain tomorrow, so we tried to get as much of the cutting done today since we were doing it all outside. I just checked the forecast now, and there’s no rain forecast for tomorrow, so maybe we will be able to get the bathroom floor gutted and plywood down after all.

I have to say that the best tool I have, and used today, was my Dad’s old variable-speed Black & Decker drill. It has to be around 30 years old and still works like a charm. My own drill is not variable-speed.  With a Robertson screw driver bit in it, it was a huge time saver screwing down all the plywood. I can’t imaging the hell it would have been screwing them all down by hand. There’s no way I could have done it. His old steel yard stick also came in handy. My Dad used to do a lot of home reno projects when I was a kid, so I like to think that he was with us in spirit, via his old tools. Thanks Dad! :)